Yi Ding(丁一,指导教师), TianYi Gu, GuoLong Lin, ChengJi Liang
《Applied Mathematics & Information Sciences》(SCI收录)
2013, Volume 6, No. 6-3S, Pages 915-924
Abstract
The logistics operation of container terminal can be exploded into several subsystems which are correlative, these sub- systems connect by some handling facilities. This paper study the coordinated scheduling of three main kinds of facilities-Quay Crane(QC),Yard Truck(YT) and Yard Crane(YC), use multidisciplinary variable coupling design optimization method(MVCDO) to build YT coordinated scheduling coupling model based on QC, obtain the YT coordinated scheduling scheme faced multi- working lanes. This paper presents a new way of studying the coordinated scheduling of handling facilities in container terminals through building coupling model.