Ding, Yi(丁一),Gu, TianYi,Lin, GuoLong(林国龙),Liang, ChengJi(梁承姬)
《APPLIED MATHEMATICS & INFORMATION SCIENCES》
November 2012, Volume 6, Issue 3, Pages 915-924
Abstract
The logistics operation of container terminal can be exploded into several subsystems which are correlative, these subsystems connect by some handling facilities. This paper study the coordinated scheduling of three main kinds of facilities-Quay Crane(QC),Yard Truck(YT) and Yard Crane(YC), use multidisciplinary variable coupling design optimization method(MVCDO) to build YT coordinated scheduling coupling model based on QC, obtain the YT coordinated scheduling scheme faced multi- working lanes. This paper presents a new way of studying the coordinated scheduling of handling facilities in container terminals through building coupling model.